

Here they are . . . a couple of pictures of my new car!
Once again I am surprised how long it has taken me to make a post, so I'll just get right to it.
Even though it's been awhile since our last post, there has been progress made on the bathroom projects. The new vinyl floor has been installed and the cabinets in the main bathroom have been painted white. Once the trim is hung we'll have that bathroom done (unless we decide to replace the counter top), with the master bathroom to finish. In the Master bathroom we still need to paint the cabinets, install the toilet, and hang the trim.
It was back to work on the master bathroom this past week. The walls have gone from poop brown to "Cumberland Fog". Much calmer and brighter! We also hung the light fixture today. Unfortunately after we put it up we realized that although now that it is centered over the sink, it is not centered with the mirror. The mirror is too big and we'll have to get it cut down a tad. We have definitily ran into more setbacks with this bathroom than the other one. Errrr. The flooring has come in and we should be getting it scheduled to be installed soon.







